Next post of the day I'm catching up this ones from two weeks ago. I have almost finished the bathroom just need to make a bath panel and get a heated towel rail fitted. We have no central heating so we could do with one. However the shower packed up after after all that effort to make sure it fitted ok. A temperature switch on the outlet burned out so we only had cold water.

I didn't want to go to all the hassle of upgrading the supply cable and the circuit breaker so I brought the new equivalent to the old one. It has the same 7kW power rating and cold water feed and power connections. The only difference was that the hole for the bottom wall fixing screw was in a different place so had to drill a new hole and seal the old one.
It looks ok and we really couldn't do without a shower. Our hot water tank is quite small it doesn't provide enough hot water to fill a bath. That's another job to have a bigger tank fitted.
Well we'll knock them off the list one job at a time.KBO.